Warehouse Roof Renovation Logistics Serang
Status Proyek
Selesai (2024)
Lokasi
Kawasan Industri Modern Cikande, Banten
Luas Area
5.000 m²
Material
Spandek Lapis Aluminium-Zink (AZ150)
Deskripsi Proyek
This project involved a complete replacement of an old roofing system suffering from severe corrosion and systemic leakage. The main focus was ensuring the replacement process ran simultaneously with logistics activities in the warehouse which remained operational 24/7.
Tantangan Teknis
- Zero Downtime: The client required no dust or water leakage during the transition from old to new roofing due to sensitive electronics below.
- Structural Load: Adjustment of light steel frames to support additional loads from planned solar panels.
Solusi & Inovasi
Using the Over-Roofing method combined with structural analysis from the BARI AI assistant to determine the most optimal load points. The technical team implemented a modular installation system that kept the area below safe from weather and construction debris.
Hasil Akhir
- Temperature Efficiency: Room temperature reduced by 3-5°C with reflective roofing material.
- Durability: 10-year structural and leakage warranty.
- Speed: Project completed 5 days ahead of schedule without stopping warehouse operations for a single day.