Automotive Manufacturing Plant Roof Construction

Automotive Manufacturing Plant Roof Construction

Status Proyek
Selesai (2025)
Lokasi
Cikarang, Jawa Barat
Luas Area
12.000 m²
Material
Spandek Lapis Aluminium-Zink (AZ150)

Deskripsi Proyek

This project involved a complete replacement of an old roofing system suffering from severe corrosion and systemic leakage. The main focus was ensuring the replacement process ran simultaneously with production activities in the factory which remained operational 24/7.

Tantangan Teknis

  1. Zero Downtime: The client required no dust or water leakage during the transition from old to new roofing.

Solusi & Inovasi

Using the Over-Roofing method combined with structural analysis from the BARI AI assistant.

Hasil Akhir

  • Durability: 10-year structural and leakage warranty.