Kembali ke studi kasus

Automotive Manufacturing Plant Roof Construction
Status Proyek
Selesai (2026)
Lokasi
Subang, Jawa Barat
Luas Area
8.000 m²
Material
Spandek Lapis Aluminium-Zink (AZ150)
Deskripsi Proyek
This project involved a complete replacement of an old roofing system suffering from severe corrosion and systemic leakage. The main focus was ensuring the replacement process ran simultaneously with production activities in the factory which remained operational 24/7.
Tantangan Teknis
- Zero Downtime: The client required no dust or water leakage during the transition from old to new roofing.
Solusi & Inovasi
Using the Over-Roofing method combined with structural analysis from the BARI AI assistant.
Hasil Akhir
- Durability: 10-year structural and leakage warranty.
Butuh solusi atap serupa untuk proyek Anda?
Konsultasi proyek